Our Solutions

1. DATABASE

2. STREAMING & PROCESSING

3. DATA PLATFORM

4. DBsecops

0
production-grade database workloads successfully deployed
0
Certified Database Specialist Certification across Oracle, PostgreSQL, MySQL, Redis ...
0
trusted solution partners across various industries and domains
0
years of experience in enterprise data infrastructure and delivery

BNH success case

Our Customers Achieve Extraordinary Results

MSB

12/03/2026

MSB required a high-performance data integration and synchronization solution utilizing Oracle GoldenGate (OGG) and Confluent Kafka. The project focused on building a real-time data pipeline to bridge the gap between their mission-critical Oracle databases and modern analytics platforms. By implementing OGG for Change Data Capture (CDC) and integrating it with the Confluent ecosystem, the bank achieved seamless, low-latency data streaming. This solution not only ensures high availability and data consistency across hybrid cloud environments but also empowers the bank’s DevOps and Data Engineering teams with a scalable, event-driven architecture to support real-time financial reporting and enhanced customer insights.

VP BANK

05/02/2024

VPBank required a Character Set migration and standardization solution for their core database systems. The project focused on ensuring seamless data integrity during conversion, preventing font errors across banking applications, and unifying data encoding to support global integration standards. This optimization ensures that all customer and transaction information remains consistent and searchable throughout the bank's infrastructure.

SHB

03/07/2021

SHB executed a complex Data Center Moving (DC Moving) project involving their high-performance Oracle Exadata infrastructure. The project demanded a rigorous migration strategy to ensure zero data loss and minimal downtime for critical banking operations. By optimizing the Exadata environment during the transition, the bank achieved enhanced system stability, superior processing power, and a modernized hardware footprint in the new facility.